Tontitown SMP

project

Project and Timeline


Project Information

The City of Tontitown developed a citywide Stormwater Master Plan (SMP). This plan included identifying, analyzing, and prioritizing drainage issues within the City. The SMP included a Capital Improvement Plan (CIP) with a list of projects to address and mitigate drainage issues.

 

The purpose of the City of Tontitown SMP was to:

  • Evaluate the existing drainage conditions of the City

  • Identify current and future drainage problems

  • Generate proposed solutions to identified problems

  • Develop a Capital Improvement Plan (CIP)

  • Provide tools for managing future development


Project Process

Implementation

The Stormwater Master Plan (SMP) was used to identify drainage problems within the City and propose solutions to these problems. A citywide Capital Improvement Plan (CIP) for drainage projects was developed during the final stages of this study which included a list of citywide drainage projects with conceptual design solutions and cost estimates.  Prioritization criteria was developed as part of this CIP to help the city prioritize and begin design and construction on the most needed projects following the completion of this study.  

 


City Contact

For questions related to the project, contact the city:

 

James Clark

pwdirector@tontitown.gov🔗